Portfolio Click on text to enlarge image With our Comacchio MC-22, the jewel of the Comacchio line up we can really shine in deep foundation work & narrow spaces. With our Comacchio MC-8 we can provide our efficient pile installation even with limited access or in smaller spaces. With our Movax Sonic Sidegrip Vibratory Pile Driver we provide savings in time & cost, greater safety & productivity, quicker setup & completion. A recent small project installing sheet piling on the water. For sheet pile driving we utilize our Movax sonic sidegrip vibratory pile driver. A view of the final product. The Movax sonic sidegrip vibratory pile driver is one of our most sought-after services. We can provide a streamlined approach when we have to minimize our work area amidst busy city transit and public areas. We collaborate with other disciplines to ensure safe and efficient installation. Installing helical piles in Madison Square Park for Erwin Redl’s Whiteout art installation. Working adjacent to Shake Shack, One Madison, Madison Square Park Tower, and the landmark Met Life Tower. We worked closely with the client to ensure helical pile placement was precise to meet the art installation design needs. Installing helical piles on the north side of Madison Square Park. Working with the famous Flatiron Building as a backdrop. A view of Erwin Redl’s Whiteout art installation complete & illuminated at night. Utilizing the Comacchio MC22 for pile driving. Installing mini-piles at St Clare’s Hospital in New Jersey. Installing tiebacks on the east side of Manhattan. Installing mini-piles for Bruckner Plaza Redevelopment in the Bronx. Our crews produce high-quality results. Mini-pile welding was completed ahead of schedule. We specialize in Tiebacks. We have one of the few sonic pile drivers in the area. Sonic pile driving at Morristown Airport in New Jersey. Another specialty, cross bracing, rakers, and walers in downtown Manhattan. We often utilize the powerful Comacchio MC series for drilling. We have an efficient system to install Timber Lagging with simultaneous Welding. Soldier piling via duplex method with a Comacchio. Soldier piles and Timber Lagging complete, ready to start installing tiebacks. Installing tiebacks in downtown Manhattan. Finished product with double tiebacks complete. Our crew is trained to proactively help move the project forward. Our piles & tiebacks provide solid SOE for adjacent construction of the foundation wall. Closeup of our top tier of the double tiebacks. Installing Stelcor mini-piles at Rutgers University. Pile load tests require the utmost accuracy in design, installation, and testing. Our pile load tests pass with flying colors. Wood piling requires our specialty drillers’ decades of experience. Installing wood piling with the sonic sidegrip vibratory pile driver. Installing Stelcor mini-piles in confined indoor space in Harlem. Demolition requires attentive strategy that we specialize in. Demolition and disposal off-site. We have a fleet of vehicles that can cover large-scale excavation and disposal. Installing over 130 soil borings and 70 injection wells in several lots over 20 days at a site in Hackensack. Installing over 130 soil borings and 70 injection wells in several lots over 20 days at a site in Hackensack. Using hollow stem augers to install a monitoring well (Simco 2800 drill rig). Onsite decon unit, decontaminating drilling equipment at a hexavalent chromium site in NJ. In order to remediate petroleum contaminated soils approximately 30 feet beneath this house, we had the house moved along steel beams. After remediation, foundation was reinforced and house was replaced. Vapor mitigation barrier installed during pre-construction of bank.
With our Comacchio MC-22, the jewel of the Comacchio line up we can really shine in deep foundation work & narrow spaces.
With our Comacchio MC-8 we can provide our efficient pile installation even with limited access or in smaller spaces.
With our Movax Sonic Sidegrip Vibratory Pile Driver we provide savings in time & cost, greater safety & productivity, quicker setup & completion.
We can provide a streamlined approach when we have to minimize our work area amidst busy city transit and public areas.
Working adjacent to Shake Shack, One Madison, Madison Square Park Tower, and the landmark Met Life Tower.
We worked closely with the client to ensure helical pile placement was precise to meet the art installation design needs.
Installing over 130 soil borings and 70 injection wells in several lots over 20 days at a site in Hackensack.
Installing over 130 soil borings and 70 injection wells in several lots over 20 days at a site in Hackensack.
In order to remediate petroleum contaminated soils approximately 30 feet beneath this house, we had the house moved along steel beams. After remediation, foundation was reinforced and house was replaced.