Portfolio Click on text to enlarge image Utilizing the Comacchio MC22 for pile driving. Installing mini-piles at St Clare’s Hospital in New Jersey. Installing tiebacks on the east side of Manhattan. Installing mini-piles for Bruckner Plaza Redevelopment in the Bronx. Our crews produce high-quality results. Mini-pile welding was completed ahead of schedule. We specialize in Tiebacks. We have one of the few sonic pile drivers in the area. Sonic pile driving at Morristown Airport in New Jersey. Another specialty, cross bracing, rakers, and walers in downtown Manhattan. We often utilize the powerful Comacchio MC series for drilling. We have an efficient system to install Timber Lagging with simultaneous Welding. Soldier piling via duplex method with a Comacchio. Soldier piles and Timber Lagging complete, ready to start installing tiebacks. Installing tiebacks in downtown Manhattan. Finished product with double tiebacks complete. Installing Stelcor mini-piles at Rutgers University. Pile load tests require the utmost accuracy in design, installation, and testing. Our pile load tests pass with flying colors. Wood piling requires our specialty drillers’ decades of experience. Installing wood piling with the sonic sidegrip vibratory pile driver. Installing Stelcor mini-piles in confined indoor space in Harlem. Demolition requires attentive strategy that we specialize in. Demolition and disposal off-site. We have a fleet of vehicles that can cover large-scale excavation and disposal. Installing over 130 soil borings and 70 injection wells in several lots over 20 days at a site in Hackensack. Installing over 130 soil borings and 70 injection wells in several lots over 20 days at a site in Hackensack. Using hollow stem augers to install a monitoring well (Simco 2800 drill rig) Onsite decon unit, decontaminating drilling equipment at a hexavalent chromium site in NJ In order to remediate petroleum contaminated soils approximately 30 feet beneath this house, we had the house moved along steel beams. After remediation, foundation was reinforced and house was replaced. Vapor mitigation barrier installed during pre-construction of bank
Installing over 130 soil borings and 70 injection wells in several lots over 20 days at a site in Hackensack.
Installing over 130 soil borings and 70 injection wells in several lots over 20 days at a site in Hackensack.
In order to remediate petroleum contaminated soils approximately 30 feet beneath this house, we had the house moved along steel beams. After remediation, foundation was reinforced and house was replaced.